Construction procedures

Built right, from the ground up.

Hardscape that survives twenty Ontario winters starts below grade. Every project moves through the same six checkpoints — no shortcuts.

  1. Clean Digging

    Excavate, square the corners, remove organics. A clean cavity is the start of every clean install.

  2. 1 ft Depth Excavation

    Full 12-inch dig on driveways. Engineered base only works if there's room for it.

  3. High-Performance Bedding

    Compacted ¾-clear stone in lifts, geotextile fabric where soil mechanics demand it.

  4. Precision Layout

    String lines, laser-level checks, dry-laid pattern verification before any joint is set.

  5. Cutting & Adjusting

    Wet-saw cuts at edges and obstructions, hand-fitted closures. No grinder mess on a Green Rhino site.

  6. Grouting & Finishing

    Polymeric joint sand, edge restraints, final compaction. The yard you see is the yard that lasts.